88 parts

Forum for discussion relating to the 88mm Flak36
Gary Richardson
Posts: 546
Joined: Tue Sep 07, 2021 5:37 pm
Location: Somerset
Has liked: 724 times
Been liked: 1667 times

Re: 88 parts

Post by Gary Richardson »

Hi Phil

Superb workmanship, it's a real treat watching your build progress.

Regards
Gary
2021 Late Tiger 1 Abteilung 301 (Funklenk), 2022 Churchill Mk3 AVRE, 2x Czech Hedgehogs, 2024 Triple span Bailey Bridge, M26 Pershing, 17 Pounder and Limber.

Phil Woollard
Posts: 4268
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2259 times
Been liked: 7147 times

Re: 88 parts

Post by Phil Woollard »

The handbrake lever has come together nicely, just got to replicate for the other end.
Attachments
IMG_20241003_170313.jpg
Hand filing the handles
Hand filing the handles
Silver soldering
Silver soldering
Silver soldering
Silver soldering
That's about the height
That's about the height
When set up correctly the real thing didn't move that much, it was also power assisted from the air system powered from the on-board compressor in the kdfz7
When set up correctly the real thing didn't move that much, it was also power assisted from the air system powered from the on-board compressor in the kdfz7
IMG_20241003_165514.jpg
The angle of the trigger will change to "more open" as I "fit" the parts, it's all a bit tight right now
The angle of the trigger will change to "more open" as I "fit" the parts, it's all a bit tight right now
And it functions
And it functions
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Phil Woollard
Posts: 4268
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2259 times
Been liked: 7147 times

Re: 88 parts

Post by Phil Woollard »

The air brake system
Attachments
Air system isolation valve parts turned ready to be soldered
Air system isolation valve parts turned ready to be soldered
One little job is to replace the huge m3 fender bolts with m2 bolts, still too big but a compromise
One little job is to replace the huge m3 fender bolts with m2 bolts, still too big but a compromise
IMG_20241007_155749.jpg
Silver soldered isolation valve with mount, I'm using aluminium welding rod as the air pipe plumbing
Silver soldered isolation valve with mount, I'm using aluminium welding rod as the air pipe plumbing
IMG_20241007_170556.jpg
The air cylinders are now joined with in and out pipe work
The air cylinders are now joined with in and out pipe work
IMG_20241007_170614.jpg
This tail end  pipe will have yet another air coupler courtesy of Mr Lewington
This tail end pipe will have yet another air coupler courtesy of Mr Lewington
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Phil Woollard
Posts: 4268
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2259 times
Been liked: 7147 times

Re: 88 parts

Post by Phil Woollard »

The tow bar is milled from a solid billet of aluminium
Attachments
IMG_20241014_153440.jpg
IMG_20241014_161149.jpg
Sketchy
Sketchy
Some careful work holding here
Some careful work holding here
It's an awkward piece to hold as its tapered
It's an awkward piece to hold as its tapered
Lots of filing
Lots of filing
IMG_20241018_152154.jpg
Made from one solid piece of aluminium
Made from one solid piece of aluminium
IMG_20241018_164745.jpg
There's an unusual bracket to make here
There's an unusual bracket to make here
A couple of rivets here and there and the big lift handle to finish
A couple of rivets here and there and the big lift handle to finish
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Phil Woollard
Posts: 4268
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2259 times
Been liked: 7147 times

Re: 88 parts

Post by Phil Woollard »

The draw bar detailing.
Attachments
Handles made and fitted
Handles made and fitted
IMG_20241024_145034.jpg
Flexable
Flexable
'P' clips to hold the air pipe in place
'P' clips to hold the air pipe in place
IMG_20241024_153454.jpg
Now I could also have a handle on both sides of the draw bar but I'm happy with this version
Now I could also have a handle on both sides of the draw bar but I'm happy with this version
IMG_20241024_154704.jpg
The bracket for the draw bar pins, I have no idea what this is for
The bracket for the draw bar pins, I have no idea what this is for
IMG_20241024_160756.jpg
I quite like milling parts by hand
I quite like milling parts by hand
Some filing to finish and I need a way to mount the piece
Some filing to finish and I need a way to mount the piece
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Phil Woollard
Posts: 4268
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2259 times
Been liked: 7147 times

Re: 88 parts

Post by Phil Woollard »

Well that's the boggie hard detailing all done, I'm now moving onto the cruciform and gun, I can't really show all that progress on here but you can follow on my Facebook page.
As I add the weld detail, unit markings and weathering ( I like to do all that at the same time ) I will post the results.
It will be for sale once finished, I reckon another two months work, then I'm onto the very rare Bergetiger, Tiger 331 is also for sale, so pm me if your interested.
Thanks go to Phil D and Steve L for the parts they helped me with.
Attachments
The main pin has the arm rest and that strange bracket bolted in place, this replicated front and back.
The main pin has the arm rest and that strange bracket bolted in place, this replicated front and back.
IMG_20241025_161135.jpg
IMG_20241025_161127.jpg
IMG_20241025_161139.jpg
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Post Reply