88 parts

Forum for discussion relating to the 88mm Flak36
Gary Richardson
Posts: 540
Joined: Tue Sep 07, 2021 5:37 pm
Location: Somerset
Has liked: 717 times
Been liked: 1648 times

Re: 88 parts

Post by Gary Richardson »

Hi Phil

Superb workmanship, it's a real treat watching your build progress.

Regards
Gary
2021 Late Tiger 1 Abteilung 301 (Funklenk), 2022 Churchill Mk3 AVRE, 2x Czech Hedgehogs, 2024 Triple span Bailey Bridge, M26 Pershing, 17 Pounder.

Phil Woollard
Posts: 4263
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2254 times
Been liked: 7130 times

Re: 88 parts

Post by Phil Woollard »

The handbrake lever has come together nicely, just got to replicate for the other end.
Attachments
IMG_20241003_170313.jpg
Hand filing the handles
Hand filing the handles
Silver soldering
Silver soldering
Silver soldering
Silver soldering
That's about the height
That's about the height
When set up correctly the real thing didn't move that much, it was also power assisted from the air system powered from the on-board compressor in the kdfz7
When set up correctly the real thing didn't move that much, it was also power assisted from the air system powered from the on-board compressor in the kdfz7
IMG_20241003_165514.jpg
The angle of the trigger will change to "more open" as I "fit" the parts, it's all a bit tight right now
The angle of the trigger will change to "more open" as I "fit" the parts, it's all a bit tight right now
And it functions
And it functions
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Phil Woollard
Posts: 4263
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2254 times
Been liked: 7130 times

Re: 88 parts

Post by Phil Woollard »

The air brake system
Attachments
Air system isolation valve parts turned ready to be soldered
Air system isolation valve parts turned ready to be soldered
One little job is to replace the huge m3 fender bolts with m2 bolts, still too big but a compromise
One little job is to replace the huge m3 fender bolts with m2 bolts, still too big but a compromise
IMG_20241007_155749.jpg
Silver soldered isolation valve with mount, I'm using aluminium welding rod as the air pipe plumbing
Silver soldered isolation valve with mount, I'm using aluminium welding rod as the air pipe plumbing
IMG_20241007_170556.jpg
The air cylinders are now joined with in and out pipe work
The air cylinders are now joined with in and out pipe work
IMG_20241007_170614.jpg
This tail end  pipe will have yet another air coupler courtesy of Mr Lewington
This tail end pipe will have yet another air coupler courtesy of Mr Lewington
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Phil Woollard
Posts: 4263
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2254 times
Been liked: 7130 times

Re: 88 parts

Post by Phil Woollard »

The tow bar is milled from a solid billet of aluminium
Attachments
IMG_20241014_153440.jpg
IMG_20241014_161149.jpg
Sketchy
Sketchy
Some careful work holding here
Some careful work holding here
It's an awkward piece to hold as its tapered
It's an awkward piece to hold as its tapered
Lots of filing
Lots of filing
IMG_20241018_152154.jpg
Made from one solid piece of aluminium
Made from one solid piece of aluminium
IMG_20241018_164745.jpg
There's an unusual bracket to make here
There's an unusual bracket to make here
A couple of rivets here and there and the big lift handle to finish
A couple of rivets here and there and the big lift handle to finish
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Post Reply