Hi
I am setting up the option pack on the bench before installing, could anyone please advise what connects into which Amps socket
I have already plugged Motor control A into the 30Amps as advised
1) Which socket should be turret and elevation, which is on a Y connection
2) Sound module
3) 24v to 5v converter (recoil module)
4) Smoke
Many thanks
Steve
New power option pack setup
- Steve Cope
- Posts: 53
- Joined: Tue Mar 14, 2023 11:35 am
- Location: South Wales
- Has liked: 31 times
- Been liked: 18 times
- Adrian Harris
- Posts: 5059
- Joined: Thu Jul 12, 2007 10:46 pm
- Location: Berkshire (UK)
- Has liked: 1364 times
- Been liked: 1564 times
Re: New power option pack setup
In the Churchill instructions, the elevation and traverse goes to a 15A socket, the Audio Module goes to a 10A, the recoil goes to a 10A socket and the smoker goes to a 20A socket.
Adrian.
Adrian.
Contact me at sales@armortekaddict.uk for details of my smoker fan control module
- Steve Cope
- Posts: 53
- Joined: Tue Mar 14, 2023 11:35 am
- Location: South Wales
- Has liked: 31 times
- Been liked: 18 times