2021 Late Tiger 1 - development and production

Posted: Tue Jun 01, 2021 3:10 pm
by Armortek
Those of you that follow the factory diary will have see that we are making a few changes to the Late variant Tiger 1 that will be shipping later this summer.

In total there are 27 changes that we are pushing through.

There range from some minor changes like slotting holes to make assembly a little easier, or tweaking the position of some parts on the deck to more substantial changes, or changing the assembly of the drive case.

The most noticeable changes will be:
- Modified hub caps
Tiger hubcap (1).PNG
Tiger hubcap (1).PNG (325.31 KiB) Viewed 3869 times
- Modified roof vent and close defence weapon
Tiger 1 roof.PNG
- Elevation mechanism changed from lead screw to linear actuator

- Slip ring to provide continuous 360 turret rotation

Photos will follow on this thread as we build up the Tiger 1. Our process is a little different as we do not need to prototype the tank - all we have to do is validate the production parts and we build our Validation Build.

Re: 2021 Late Tiger 1 - development and production

Posted: Thu Jun 03, 2021 7:52 am
by Vince Cutajar
Nice.

Already done the hubcup, turret ventilator and close defence weapon alterations. Looking forward to see the other visible modifications to the upcoming Tiger 1.

Vince

Re: 2021 Late Tiger 1 - development and production

Posted: Mon Jun 21, 2021 7:32 pm
by Armortek
Thanks Vince.

Here are a couple of photos of the redesigned roof vent. One of the left is the old design - one on the right, the new one.
Roof vent 1.jpg
Roof vent 2.jpg

Re: 2021 Late Tiger 1 - development and production

Posted: Sun Jul 11, 2021 12:28 pm
by Armortek
Machining the Idler Wheels - this is the third of three operations.


Re: 2021 Late Tiger 1 - development and production

Posted: Sun Jul 18, 2021 10:27 am
by Phil Woollard
How about cleated late Tiger 1 tracks? That would make more sense. 8)

Re: 2021 Late Tiger 1 - development and production

Posted: Wed Apr 13, 2022 7:49 am
by Chang
Armortek wrote:
Tue Jun 01, 2021 3:10 pm
Those of you that follow the factory diary will have see that we are making a few changes to the Late variant Tiger 1 that will be shipping later this summer.

In total there are 27 changes that we are pushing through.
.....
- Elevation mechanism changed from lead screw to linear actuator
- Slip ring to provide continuous 360 turret rotation

Photos will follow on this thread as we build up the Tiger 1. Our process is a little different as we do not need to prototype the tank - all we have to do is validate the production parts and we build our Validation Build.
Hope to learn more of these changes soon. :idea:

Cheers,
Lerh Chang