Smoke Unit

Forum for discussion relating to Tiger 1, Mid, Early, Late Production and Sturmtiger
Post Reply
Robert Meyer
Posts: 3
Joined: Tue Feb 28, 2012 7:02 pm

Smoke Unit

Post by Robert Meyer »

Hello

I bought a smoke unit for my late model tiger and it didn't come with instructions. I have most of it figured out but I don't know where the MATTING goes. Can someone tell where the matting is installed.

Thanks

Bob

John Fitzsimons
Posts: 1816
Joined: Tue Dec 14, 2010 3:11 pm
Location: IRELAND,Dublin/Meath
Has liked: 5 times
Been liked: 629 times
Contact:

Re: Smoke Unit

Post by John Fitzsimons »

Contact Gill. She can email the instructions. It goes over the heating element but needs to be shaped.

Paul Fairlamb

Re: Smoke Unit

Post by Paul Fairlamb »

Robert

Further to John's advice, it acts as a wick drawing fluid from the reservoir to the element. As John suggests it is shapped around the element tube, I secured mine with a stapler, it does not have to very tight because when all is assembled it has nowhere to go. Remember to orientate the free ends down.

The Armortek instructions say, "Form the matting into an omega shape around the heat tube and stable into place."

regards

Paul

Robert Meyer
Posts: 3
Joined: Tue Feb 28, 2012 7:02 pm

Re: Smoke Unit

Post by Robert Meyer »

Ok. I think I have it now. Thanks for the help.

Robert

Post Reply