Bailey bridge production run
-
- Posts: 852
- Joined: Sun Apr 03, 2016 3:39 pm
- Location: Germany
- Has liked: 270 times
- Been liked: 324 times
- Kenneth Hartsfield
- Posts: 59
- Joined: Tue Jun 13, 2023 6:41 pm
- Location: USA
- Has liked: 38 times
- Been liked: 3 times
-
- Posts: 107
- Joined: Mon Jul 20, 2015 4:38 pm
- Has liked: 87 times
- Been liked: 50 times
-
- Posts: 584
- Joined: Mon Oct 09, 2017 9:49 pm
- Has liked: 99 times
- Been liked: 446 times
Re: Bailey bridge production run
I am a firm order for three spans if you do these.
I'd also get a couple of Czech Hedgehogs at the same time.
Thanks and cheers!
RPR
I'd also get a couple of Czech Hedgehogs at the same time.
Thanks and cheers!
RPR
-
- Posts: 12
- Joined: Sun Jul 09, 2023 6:57 pm
- Location: Lanzarote
- Has liked: 18 times
- Been liked: 4 times
Re: Bailey bridge production run
I'd be interested in ordering a 3 span double with a ramp at each each end, and I'd be happy to source wood locally rather than have it shipped internationally.
Looking at the main photo on the shop page, for my purposes the illustrated kit would need to be supplemented with 1 extra span of deck including 2 extra side panels plus 6 extra side panels to double it up.
Looking at the main photo on the shop page, for my purposes the illustrated kit would need to be supplemented with 1 extra span of deck including 2 extra side panels plus 6 extra side panels to double it up.
-
- Posts: 4
- Joined: Mon Sep 17, 2018 10:23 pm
- Has liked: 4 times
- Been liked: 2 times
Re: Bailey bridge production run
I‘m also interested in the bridge preferable with ramps both sides harryfriede@web.de
- Armortek
- Site Admin
- Posts: 2899
- Joined: Tue Jul 10, 2007 10:30 am
- Location: Winchester, England
- Been liked: 3501 times
Re: Bailey bridge production run
Good news - fabrication of the Bailey Bridge parts has started.
There is a lot of bending to get through, so we expect production to be completed in around 8 to 10 weeks.
There is a lot of bending to get through, so we expect production to be completed in around 8 to 10 weeks.
Armortek
-
- Posts: 222
- Joined: Wed Feb 13, 2013 7:57 pm
- Location: Cologne Area, Germany
- Has liked: 2 times
- Been liked: 65 times
Re: Bailey bridge production run
Excellent News ,
playing "bridge" the last cold month I'm looking forward to set the extension order, great !
greetings from the Cologne Area, Uwe
playing "bridge" the last cold month I'm looking forward to set the extension order, great !
greetings from the Cologne Area, Uwe
1:16 Models: Kingtiger
1:10 Models: Flak-Panther Coelian, Panther A , S.WS with 3,7cm Flak 37
1:6 Armortek Models: Flak 36 2006, Kingtiger 2013, PAK 43/41 2015, SdKfz 251 2016, FAMO 2018
1:6 other Models: Opel Blitz , Kübelwagen , Zündapp KS750 etc...
1:10 Models: Flak-Panther Coelian, Panther A , S.WS with 3,7cm Flak 37
1:6 Armortek Models: Flak 36 2006, Kingtiger 2013, PAK 43/41 2015, SdKfz 251 2016, FAMO 2018
1:6 other Models: Opel Blitz , Kübelwagen , Zündapp KS750 etc...
-
- Posts: 584
- Joined: Mon Oct 09, 2017 9:49 pm
- Has liked: 99 times
- Been liked: 446 times
Re: Bailey bridge production run
So are we on a list? Or first come first-served?
BTW, I can also source wood in USA to facilitate shipping if that helps! I actually have some wood specially set aside for my bridge.
Cheers,
RPR
- Armortek
- Site Admin
- Posts: 2899
- Joined: Tue Jul 10, 2007 10:30 am
- Location: Winchester, England
- Been liked: 3501 times
Re: Bailey bridge production run
Everyone who initially responded to this post and who sent us an email is ‘on the list’.
We will have a few extra after that so it will then be on a first come first served basis until stocks run out.
EDITED: Juts to be clearer ... everyone who had contacted between Aug last year and the 6th of Feb is on the list and we will reach out to you in early March to confirm the order.
For everyone else, it is on a first come first served whilst the bridges are in stock. Stocks will be very limited.
A reminder that the bridges will not come with wood but we will provide the dimensions of the wood.
Pricing will be set once we have ordered the final laser cut parts - probably in a week or two.
Armortek
-
- Posts: 584
- Joined: Mon Oct 09, 2017 9:49 pm
- Has liked: 99 times
- Been liked: 446 times
Re: Bailey bridge production run
Armortek wrote: ↑Fri Feb 09, 2024 8:35 amEveryone who initially responded to this post and who sent us an email is ‘on the list’.
We will have a few extra after that so it will then be on a first come first served basis until stocks run out.
EDITED: Juts to be clearer ... everyone who had contacted between Aug last year and the 6th of Feb is on the list and we will reach out to you in early March to confirm the order.
For everyone else, it is on a first come first served whilst the bridges are in stock. Stocks will be very limited.
A reminder that the bridges will not come with wood but we will provide the dimensions of the wood.
Pricing will be set once we have ordered the final laser cut parts - probably in a week or two.
Perfect and thanks, Kian!
Cheers!
RPR
-
- Posts: 568
- Joined: Tue Sep 07, 2021 5:37 pm
- Location: Somerset
- Has liked: 755 times
- Been liked: 1772 times
Re: Bailey bridge production run
Hi Kian and Monique
I know things have been a bit crazy for you lately but I was wondering if there is any news on how the Bailey Bridge production run is going.
Regards
Gary
I know things have been a bit crazy for you lately but I was wondering if there is any news on how the Bailey Bridge production run is going.
Regards
Gary
2021 Late Tiger 1 Abteilung 301 (Funklenk), 2022 Churchill Mk3 AVRE, 2x Czech Hedgehogs, 2024 Triple span Bailey Bridge, M26 Pershing, 17 Pounder and Limber.
- Armortek
- Site Admin
- Posts: 2899
- Joined: Tue Jul 10, 2007 10:30 am
- Location: Winchester, England
- Been liked: 3501 times
Re: Bailey bridge production run
We have all the parts bent now. But we will not start packing until after the open day I think - too much to get through before then
Armortek
- Armortek
- Site Admin
- Posts: 2899
- Joined: Tue Jul 10, 2007 10:30 am
- Location: Winchester, England
- Been liked: 3501 times
Re: Bailey bridge production run
Test assembly of the Bailey Bridge has gone faster then expected!
(EDITED: Please note that as mentioned earlier we will not be supplying the wood for the decking. Unfortunately it is increasingly difficult to export wood and the paperwork is too onerous for us. We will supply the dimensions for the wood).
Early next week we will do a test pack and then get the boxes on order.
Pricing will be announced this week.
(EDITED: Please note that as mentioned earlier we will not be supplying the wood for the decking. Unfortunately it is increasingly difficult to export wood and the paperwork is too onerous for us. We will supply the dimensions for the wood).
Early next week we will do a test pack and then get the boxes on order.
Pricing will be announced this week.
Armortek
- Marco Peter
- Posts: 539
- Joined: Mon Feb 26, 2018 12:05 pm
- Has liked: 1438 times
- Been liked: 788 times
Re: Bailey bridge production run
Thanks to the smart design of the Bailey Bridge System!
'Konan', my Tiger 1 Mid
'Gunther', my Panther G
'Gunther', my Panther G