Late Tiger track links

Forum for discussion relating to Tiger 1, Mid, Early, Late Production and Sturmtiger
Post Reply
Jim Slothower
Posts: 138
Joined: Wed Apr 02, 2008 7:39 pm
Location: (Afghanistan)-Camas, Wa. USA

Late Tiger track links

Post by Jim Slothower »

How many individual links should be in each track for the Late Tiger?

I couldnt resist putting something together, so I pulled the tracks out for an afternoon build. I am assuming that some of the links are to be mounted on the turret side. My instruction book is in storage.

Thanks, Jim

Rick Tous
Posts: 4
Joined: Mon Oct 15, 2007 9:36 pm
Location: Vista, California USA

Post by Rick Tous »

Jim:

There are 93 or 94 links per section. It will depend on the individual Tiger and the angle of the suspension arms. Good luck and thank you for your service!!

Rick

Jim Slothower
Posts: 138
Joined: Wed Apr 02, 2008 7:39 pm
Location: (Afghanistan)-Camas, Wa. USA

Post by Jim Slothower »

Rick,

Thanks, I will make them at 94 links then and adjust accordingly, and your welcome.

Jim

leesellars
Posts: 934
Joined: Thu Jul 12, 2007 11:19 am
Location: Nottingham
Has liked: 2 times
Been liked: 15 times

Post by leesellars »

Hello Rick

It is strongly recomended that you stick to the Book on the suspension angles ie 35 Degrees

Lee
http://www.Facebook.com/newthorpemodels
Dont hit me so early in the morning with those negative waves.
Listen carefully i shall say this only once.
If its not broke dont fix it.
Ich Hatt Einen Kameraden

Rick Tous
Posts: 4
Joined: Mon Oct 15, 2007 9:36 pm
Location: Vista, California USA

Post by Rick Tous »

Hi Lee

Will do. I was just relating to Jim that, depending upon what he did, the number of track links could vary between 93 and 94 on a late Tiger.

Thanks for watching out for me!

Rick

Jim Slothower
Posts: 138
Joined: Wed Apr 02, 2008 7:39 pm
Location: (Afghanistan)-Camas, Wa. USA

Post by Jim Slothower »

I am pleased to announce I have completed my tracks. I cant wait till my house is done so I can spend a month just working on this.

Jim

Dale jordan
Posts: 1456
Joined: Fri Jul 13, 2007 1:10 am
Location: Port Macquarie Australia
Been liked: 514 times
Contact:

Post by Dale jordan »

Jim so much for waiting !!! Don't worry it happens to us all . I was 1/2 way though the build of my tiger . When I bought a sherman as there where only three left . The plan was to leave it in the boxes until the tiger was finished . Then one day later I thought I would open one of the boxs . two months later it was 1/3 built . Dale.

Jim Slothower
Posts: 138
Joined: Wed Apr 02, 2008 7:39 pm
Location: (Afghanistan)-Camas, Wa. USA

Post by Jim Slothower »

Dale,

Well I really planned on not even looking in the boxes until I was home for good. I guess I was kidding myself. I got to look at the Mike Standard storage bin and the instruction book. Opened the box with the turret parts in it. You just cant grasp the scale of these without handling them. I have the main box for the hull and the deck I havent looked in yet, but the temptation is getting to great.

I thought one was going to be it to, now I cant say that for certain :roll: I think my best friend has gotten the bug now also, which would be great :twisted:

Jim

Post Reply