Page 1 of 1

Photo-etched Parts Test Assemblies Update 1

Posted: Thu Mar 20, 2014 11:09 pm
by Mike Stannard (toyrific)
Hi Guys

As promised here are the first test assembly of the new parts, I will continue to update this thread with new parts as they are done.

Panther IR Scope.

This shows the mounting bracket I designed for the IR Scope, it is not possible to mount how the real one was and have it removable. When the IR Scope is removed for stowage all you can see is the three bolt lugs. With this method you can remove the IR Scope without having to remove the cupola.

Image

This shows the base bracket for the IR Scope which is bolted to the mounting bracket with three nuts and bolts. Then the IR Scope is bolted to the base bracket with two nuts and bolts.

Image

Here are a couple of views of the assembled photo-etched parts, soldering is required.

Image

Here are a couple of views with prototype parts for white metal casting. Now white metal casting masters have to be made and put in molds. Then assembly instruction have to be written.

Image


Regards
Mike

Re: Photo-etched Parts Test Assemblies

Posted: Fri Mar 21, 2014 11:52 am
by simon_manning
very nice mike, a great project and a superb extra to own. regards simon manning.

Re: Photo-etched Parts Test Assemblies 2

Posted: Sat Mar 22, 2014 11:33 pm
by Mike Stannard (toyrific)
Hi Guys

Here are the next three test assemblies.

Panther IR Scope Armored Stowage Bin. Soldering required.

Image

Image

Gurtsack Mounting Bracket

This shows the mounting bracket assembled and fitted to the MG34 AA Mount. Soldering required.

Image

Stug III C Shackles Set of 2.

Image

Regards
Mike