That was 3 hours (in Sarsons white. Might need 4 hours in Tesco own brand )
The vinegar basically removes or stains the stay-bright zinc plating so i imagine a dip in water would rust it up very quickly. The plus is it appears to be perminant so even if you painted the rope and it scratched it wouldnt show up.
It smelt so good I was tempted to salt it as well
--------------------------------------------------------
A wife is only temporary, an ex-wife is FOREVER!! The man in the avatar is my grandfather
I know mate, im obsessed It's because im in limbo waiting to move in 3 days and cant do anything else on the tank apart from play with small stuff. Once i have moved the armoured workshops will be constructed
Look at the colour of these beauties. I put them in before work (hook is primed) and 6 hrs later DA DA
Attachments
--------------------------------------------------------
A wife is only temporary, an ex-wife is FOREVER!! The man in the avatar is my grandfather
Hi Bob
That looks a great finish,is the Hook steel aswell or an alloy?
All the best for your move,hope its not too stressfull and you are up and
running soon.
Regards
Phil
Its a ploythene prototype that I made. Will cut steel ones from it. These will lift the tanks on my docks rig in my new worshops. Also making a trussing gantry similar to the real ones with turret lifting clamps and rig for removing turrets etc.
You just can't find hooks and rigging that small on the market unless they look too unrealistic
--------------------------------------------------------
A wife is only temporary, an ex-wife is FOREVER!! The man in the avatar is my grandfather