Page 3 of 4

Re: Leopard 2A7V

Posted: Fri Jun 28, 2024 7:28 am
by Rolf Mönke
Everything is visible again! Thank you.

Re: Leopard 2A7V

Posted: Fri Jun 28, 2024 11:15 am
by Robert Tanzer
Thanks for sharing your fine work.

Re: Leopard 2A7V

Posted: Fri Jun 28, 2024 8:17 pm
by Adrian Harris
Danke Günter

I have turned off the change I made and the pictures are still visible 8)

Adrian.

Re: Leopard 2A7V

Posted: Sat Jul 13, 2024 6:40 pm
by Günter Gäbelein
Hi all,

update for today.
Some parts for drivers hatch protection
Image

Image

Image

Driver compartment from backside
Image

Some parts added to the hull
Image

Image

Turret base in place
Image

Image

Image

checking the turret bearing (powered with 4V) https://www.panther-tanks.de/Leo2A7V/IMG_7664.MOV

to be followed

Re: Leopard 2A7V

Posted: Sat Aug 31, 2024 2:12 pm
by Günter Gäbelein
Hello,
here is my last update.
I started make the light side skirts used at mark 2A7V. CV0601 and CV0602 parts are designed new and printed in aluminum.
Image

Image

Image

Image

Next step was finishing the head lights ...
Image

Image

Image

Image

Image

... the indicator
Image

... and the frontside SPECTUS II sensor head. An ESP32-Cam module is implemented and the life stream is shown at the monitor in front of the driver and sent via WLAN hotspot to my smartphone :D
Image

Image

The driving motors are in place
Image

And last but not least I started modifying the turret base for the interior.
Image

Thats it for today, to be continued

Re: Leopard 2A7V

Posted: Sun Sep 01, 2024 10:54 am
by Rolf Mönke
Super!!!!!!

Re: Leopard 2A7V

Posted: Sun Sep 01, 2024 1:50 pm
by Chang
Beyond my reachable imagination!!!

Re: Leopard 2A7V

Posted: Thu Oct 03, 2024 7:32 am
by Günter Gäbelein
Hi all,
I have started to modify the turret. First of all I removed some material from the turret base for a better integration of the interior. I assume this was more than 1 kg. Furthermore, I placed some borings for the placement of the turret fron armor. In the meanwhile my 3D printer was producing some parts for gun.
Modified gun with interior parts placed at the turret base. The sliding breech mechanism is still not in place.
Image

Image

Image

The ammunition storage compartment
Image

The left hand turret inside placed to check the position of the ammunition box for the machine gun
Image

For the gun I replaced all parts of the kit to reduce the weight. I used an aluminum tube 45mm x 2,5mm x 370mm and placed a printed part at the front and the breechblock at the rear end. The bigger tube is printed in ABS too.
Image

The machine gun I had designed many years ago by measuring a machine gun from Dragon in order to design a bracket for the machine gun at my Wiesel TOW in 1:6 scale. Now this was a first try to reproduce the machine gun by myself. An it worked well.
Image

Image

Machine gun in place
Image

Image

Image

Without removing the turret roof you will probably never see the machine gun :roll:
First details placed to the left side
Image

Left hand turret side showing the additinal borings
Image

Image

Modifications at the right side according to the replacement of the EMES
Image

Thats it for today, to be followed

Re: Leopard 2A7V

Posted: Thu Oct 03, 2024 11:18 am
by Chang
This is the most detailed upgrading modelling I've ever seen. Well done Günter .

I always am thinking of adding two rear sight mirrors , a MG 3 machine gun on the turret's roof , and two correct-shape towing cables. Have you thought them too?

From an 1/16 or 1/35 scale Leopard A4.
From an 1/16 or 1/35 scale Leopard A4.
An 1/6 scale die-cast MG-3.
An 1/6 scale die-cast MG-3.
1-6 MG3-1.JPG (78.68 KiB) Viewed 1797 times
An 1/16 scale towing cable.
An 1/16 scale towing cable.
s-l400.jpg (34.25 KiB) Viewed 1797 times

Best regards,
Lerh Chang

Re: Leopard 2A7V

Posted: Fri Feb 28, 2025 4:45 pm
by Günter Gäbelein
Hi all,
my last update is long time ago. First I was working on some software for the displays and then I started designing th modification for the turret. This was very time consuming ...
Here are the fistst results:

the rear turret is a complete new design made of milled and bent alu parts and some printed ABS parts
Image

the turret will get its own power supply. The main switch is placed inside of one of the boxes
Image

at the rear side the the ice grabbers (new designed and printd in ABS) will be placed
Image

rear turret L/H
Image

next I designed the new gun mantlet introduced with Leopard 2A5
Image

the elevation servo is placed at the left side. It works with 12V and can operate 45 kg, should be enough for the gun
Image

front view of the gun mantlet
Image

a microcontroller is places in each of these ECUs to controll the dispalys and the PERI
Image

the door to the ammunition compartment is operated too
Image

view to the gunners seat
Image

starting with the front armor for the turret
Image

the EMES was replaced the gap is closed by printed parts
Image

the turret battary will be placed in the air condition compartment, distribution box in place
Image

new details placed the turret left side and on the turret roof. The loaders copula is redesigned but still not complete
Image

additional stowage boxes at the roof
Image

Image

new details added to the rear turret
Image

Image

Image

Image

Image

Image

Image

Image

Image

Next I will provide pictures about the turret front armor

Re: Leopard 2A7V

Posted: Fri Feb 28, 2025 5:07 pm
by Martin Usher
stunning work Gunter, i have now repacked mine and sent it back to Armortek for a refund, i cant compete with this, wonderful to look at for sure.
regards
Martin.

Re: Leopard 2A7V

Posted: Fri Feb 28, 2025 9:02 pm
by Christoffer Ahlfors
Not sure how to interpret this. I just hope it's a joke. Most of us here are nowhere close to Günther's league, but have great fun with our models anyway. :D

Re: Leopard 2A7V

Posted: Sun Mar 02, 2025 7:34 am
by Andre Meylan
Good morning Günter, a truckload of fine art you are performing - congratulations!

Can I please ask you a tiny detail. What material did you use to make the black step pads, is this sanding paper? I am thinking about this to make it as thin as possible but don't have a solution yet.

Best regards, André

Re: Leopard 2A7V

Posted: Sun Mar 02, 2025 6:16 pm
by Günter Gäbelein
Hi André,
yes I used 180er sanding paper. The contour is printed to a self-adhesive paper to back side of the sanding pager. Then the step pads are cutted out and the self-adhesive paper is removed before gluing the pads to the model.

Re: Leopard 2A7V

Posted: Sun Mar 02, 2025 6:22 pm
by Günter Gäbelein
Chang wrote:
Thu Oct 03, 2024 11:18 am
This is the most detailed upgrading modelling I've ever seen. Well done Günter .

I always am thinking of adding two rear sight mirrors , a MG 3 machine gun on the turret's roof , and two correct-shape towing cables. Have you thought them too?

Leo 2 mirror-0.jpg
1-6 MG3-1.JPG
s-l400.jpg

Best regards,
Lerh Chang
Hi Chang,
I am still not certain if I place the machine gun to the loaders hatch. I plan to rework the look of towing cables however, these will then not be able to tow the tank. The mirrors will be added, at least in fold down position.