CHALLENGER 2 PRE-ORDERS
NOW OPEN
EMAIL US AT SALES@ARMORTEK.CO.UK TO PRE-ORDER
CLICK HERE FOR MORE DETAILS


David's carrier build.

Forum for discussion relating to the Universal Carrier
Post Reply
Dave Dibb (Armorpax)
Posts: 1158
Joined: Thu Jul 12, 2007 6:03 pm
Location: Hampshire
Has liked: 116 times
Been liked: 1106 times
Contact:

Re: David's carrier build.

Post by Dave Dibb (Armorpax) »

Hi Phil,

Just don't want you to get it all done, set up and painted then have to swap them like someone else did..........................................

Best regards

Dave
www.armorpax.net

There used to be a nice banner here till Photobucket lost everything.............................

Phil Woollard
Posts: 4271
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2267 times
Been liked: 7152 times

Re: David's carrier build.

Post by Phil Woollard »

That's very good of you Dave.
The running in method I am using for those who are not familiar with this process, I am unable to say to much regards the tracks but I feel this little tip is worth the risk.
The tracks have been assembled one left one right with nuts facing inwards ( I don't want to see the nuts).
Each track has its own trait ( shant say no more ref that) so the track reluctantly needs easing into something that will run straight and true.
I run both tracks forward for sometime, I run both tracks in reverse for sometime, I then flip the track from left to right and run again, I then reverse the direction and run again. One more flip and you get the idea, you can then mount your tracks the correct way round and all is running pretty smoothly. 8)
Time to check the witness marks on your pla sprockets and and if necessary adjust your journals and tooth gap. Mike has even supplied a very fine abrasive powder that you can mix to a paste with water, this can then be sparingly applied to any high spot areas that need that fine tuning. You could in theory break your track in using this paste in double quick time by applying to the whole track and running for five minutes but I don't think I shall be doing that!
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

User avatar
Armortek
Site Admin
Posts: 2899
Joined: Tue Jul 10, 2007 10:30 am
Location: Winchester, England
Been liked: 3501 times

Re: David's carrier build.

Post by Armortek »

Stock tracks, stock pins and stock motion pack.

No fettling done to the links or the sprocket and built "out of the box".

Armortek

Phil Woollard
Posts: 4271
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2267 times
Been liked: 7152 times

Re: David's carrier build.

Post by Phil Woollard »

I know your very busy at Armortek with tankfest and all but could I please ask for a data sheet for the esc that you have supplied with the kit, thanks Phil.
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Derek Attree
Posts: 1284
Joined: Thu Jul 12, 2007 12:44 pm
Location: london
Has liked: 218 times
Been liked: 183 times

Re: David's carrier build.

Post by Derek Attree »

Hi Phil
It's a hobbywing quickrun 1060.
They are available from modelsport the data sheet should pop up if you Google it .

Regards

Derek
we must stop making stupid predictions

Phil Woollard
Posts: 4271
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2267 times
Been liked: 7152 times

Re: David's carrier build.

Post by Phil Woollard »

Thanks Derek, you may know the answer to this question, if we use 12v to supply the kit esc is the voltage stepped down for the receiver or will I have to install a 12v to 9v converter to safely power the receiver ?
Also the battery type link on the esc which do I use for gell lead acid?
Phil
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Jeffrey Goff
Posts: 804
Joined: Thu Jul 12, 2007 12:52 pm
Location: NORTHAMPTON
Has liked: 20 times
Been liked: 737 times

Re: David's carrier build.

Post by Jeffrey Goff »

Hi Phil, it does have a 6v 3 amp SBEC
Regards Jeff

Phil Woollard
Posts: 4271
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2267 times
Been liked: 7152 times

Re: David's carrier build.

Post by Phil Woollard »

So it's safe then, I have fried the od sound board with over voltage in the past! Thanks Jeffrey.
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Phil Woollard
Posts: 4271
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2267 times
Been liked: 7152 times

Re: David's carrier build.

Post by Phil Woollard »



It's all working well on the bench but I'm still not getting enough pressure on the brakes system but I've a few more things to try.
I tried the 1 stick wiring harness that comes with the motion pack and it immediately ruined just one of the servos for some reason, so it's back to the standard rx servo plug which works very well as you can see.
Last edited by Phil Woollard on Fri Jun 24, 2022 8:04 pm, edited 1 time in total.
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

David Merritt
Posts: 67
Joined: Tue Nov 10, 2020 12:14 pm
Location: Surrey
Has liked: 2 times
Been liked: 48 times

Re: David's carrier build.

Post by David Merritt »

Hi Phil, are you using a 12V battery? The wiring arrangement as supplied by Armortek supplies full battery voltage to the servos when actuated. This may be why one of the servos failed.

Regards David

Phil Woollard
Posts: 4271
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2267 times
Been liked: 7152 times

Re: David's carrier build.

Post by Phil Woollard »

Yes 12v, the boss said that it would work fine at this, it's the three servo harness that seemed to have caused the problem as that appears to be wired from the battery, I'm not using it now. Maybe I'm losing my touch.
The supplied motor at 12v has lots of grunt and works very well.
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Phil Woollard
Posts: 4271
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2267 times
Been liked: 7152 times

Re: David's carrier build.

Post by Phil Woollard »

A few photos of the temporary motion pack going in for a series of running gear trials.
Attachments
Good ol Dx8e
Good ol Dx8e
Although it's tight for space in there the motion pack is very compact, I'm glad that Armortek went for a smaller esc and a sound card. The only draw back is the sounds may need an external amplifier.
Although it's tight for space in there the motion pack is very compact, I'm glad that Armortek went for a smaller esc and a sound card. The only draw back is the sounds may need an external amplifier.
I won't be using that relatively huge battery it's just for the trials.
I won't be using that relatively huge battery it's just for the trials.
The three way servo harness best not used if you decide to up the voltage to 12v.
The three way servo harness best not used if you decide to up the voltage to 12v.
That motor and gearbox is more than adequate for the all up weight, it has loads of grunt! The tx throttle setting will need to be limited to around 75% of the max available as it's just to fast.
That motor and gearbox is more than adequate for the all up weight, it has loads of grunt! The tx throttle setting will need to be limited to around 75% of the max available as it's just to fast.
Using 12v really wakes the carrier up. Just got to sort the steering brake pressure, so a big mod is on the way!
Using 12v really wakes the carrier up. Just got to sort the steering brake pressure, so a big mod is on the way!
Last edited by Phil Woollard on Mon Jun 27, 2022 12:27 pm, edited 2 times in total.
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Dennis Jones
Posts: 892
Joined: Wed Feb 04, 2009 11:19 am
Location: Poole, Dorset
Has liked: 10 times
Been liked: 223 times

Re: David's carrier build.

Post by Dennis Jones »

Those servos can only work to a max voltage of 8 volts. That's why they were powered direct from the battery as only 7.2 volts lipo was recommended to be used.

Dennis.

Phil Woollard
Posts: 4271
Joined: Mon Mar 01, 2010 4:48 pm
Location: Cornwall
Has liked: 2267 times
Been liked: 7152 times

Re: David's carrier build.

Post by Phil Woollard »

Different friction material trial. It's all in bits again .
Attachments
IMG_20220627_164054.jpg
IMG_20220627_164109.jpg
Mechanical engineer.
2 Youtube channels, Phil Woollard and Magpiespyro. Facebook/ Phil Woollard.
Commission builds considered. Pm for my email.

Dennis Jones
Posts: 892
Joined: Wed Feb 04, 2009 11:19 am
Location: Poole, Dorset
Has liked: 10 times
Been liked: 223 times

Re: David's carrier build.

Post by Dennis Jones »

Been there done that on 2 tanks many times.

Dennis.

Post Reply