I'm doing masking and painting one by one.
There is no particular royal road in this painting work.
The first snow of winter is falling in Korea.
It's so cold that I'm taking a rest from painting the tank today.
Today, after completing my four-day education trip, after work, I briefly painted my Chieftain No5. at home. Today's temperature was warm, so the painting was a little easier.
Maybe by the end of this week paint work is expected to end.
I finished painting the body part of the Chieftain Tank today.
And now I've started painting the tower.
Since the tower is very heavy, I will take the safety into account, take the parts apart, finish painting and reassemble.
I'm looking at the difference between the colors of my tank and the real pictures.
I didn't match 100 percent, but I felt the need to make some modifications, and I worked hard to peel off some of the existing paint.
Youngjae
Attachments
b5a6979ee7afa85b1895def62fa322ec.jpg (66.64 KiB) Viewed 2018 times
I finished the modified painting work today after work.
I'm going to install the option packs next week.
The option packs are scheduled to arrive on Monday.
However, it is expected to arrive rather late due to the strike by the Korean UPS.
But I am very happy now with the hope that my Chieftain can run in my house yard before Christmas.